File/s needed: |
---|
Click to download the METRIC model files. |
Now that the Treatment Train is laid out you can review the Analysis Criteria and Rainfall set up by browsing to the Analysis ribbon and selecting Analysis Criteria.
Update s/shot
Now that we know our network is valid we can run the analysis. This can be done by selecting Go under the Analysis ribbon.
Note: Validation is automatically run when selecting Go.
Viewing a long section Profile of the entire Treatment Train is often the easiest way to check the volume performance on a site. The Profiles > Show Profile can be selected under the Results ribbon. The Profile animation playback is located at the bottom of the Profile view. Change the Storm Selection to the 240 mins Winter event and you can see the basin filling.
This then opens up the following window which displays the status in the pipes for either all items or specific connections. As we only have one flow path it does not matter if the Select Filter option is selected as All Items or Flow Path. Update both s/shots.
The Critical Storm for pipes can be determined by selecting Critical Storm at the top of the window. This allows you to analyse which storms provide the worst conditions for the pipes in your network.
After running the analysis the Stormwater Controls Summary window is automatically displayed, within this window we can select Critical Storm, just like with the pipes, to show us the worst case scenario.