Add Detention Vault

Widget Connector
urlhttp://youtube.com/watch?v=gm78Hww37O4

Add Arch Chamber

Since CAD does not represent Stormwater Controls (i.e. Ponds, Swales, Raingardens) as richly in Plan as xpdrainage does, the Pipe Network that was imported is overly simplified and uses ‘dummy’ objects as placeholders for designers who are forced to split their work between several tools. To achieve proper Runoff Mitigation an Underground Detention Vault needs Detention Arch Chamber needs to be added, which can be easily done by converting the ‘dummy’ junction into a full Stormwater Control (SWC).

Right-click Standard MH (11) and select select Change Template.

Image RemovedImage Added 


Select Parking Vault from Select Arch Chamber from the Template list and change the Label name to VaultArch Chamber. Select OK to close the dialog.

Image RemovedImage AddedImage Removed

Image Added


Double-click or right-click and select select Edit to  to review the Vault Arch Chamber Stormwater Control (SWC) properties. Notice void ratio is set to 95% based on manufacturers specifications and that the facility is 4ft deep. The area that the facility extends is represented by the footprint shown in Plan viewThis facility uses the Parabolic Arch Chamber configuration type and the individual Chamber section lengths, wall thickness, diameter and height are all as noted in manufacturer specifications. Any change to input which would affect the facility extents will be represented in Plan, just like any changes to the Plan layout will update dimension details within the SWC properties. Use the the Click to Show Images icon  icon in the lower left of the dialog to view a schematic of what the parking vault looks like.

Image Removed

Under the Outlets tab, from the Outlet Type dropdown list, select Weir and ender a width of 3ft and set the crest level to 169.5. This will set a 3ft wide broad crested weir 3what the underground detention chambers looks like.

The embedded parameters allow for the fill material above and around the chambers to be applied toward facility storage. Notice that the schematic view of the detention facility can be switched from Plan (top down) view to a Section (or an on-end profile) view.

Image Added

Image Added


Under the Outlets tab, from the Outlet Type drop down list, select Orifice and enter a Diameter of 0.5ft and set the invert level to 167.3. This will set a 6in orifice 1.5ft above the base of the vaultChambers. Select Select OK to  to close the SWC dialog.

Image RemovedImage Added


Reconnect System

Since Since xpdrainage allows for ‘AS-BUILT’ BUILD’ layout and details of stormwater systems, it is valuable to place the Inlets and Outlet of this facility at the real world proposed locations to ensure connection inverts, lengths, and slopes are accurate. Right-click the Vault SWC and select the Arch Chamber SWC and select Specify Inlet/Outlet Location, select one of  one of the Inlets/outlet. You can then drag and drop the Inlet/Outlet to the appropriate location. Repeat process for  for all objects until they are located as shown.

Image RemovedImage AddedImage Removed

Image Added


When the Pipe Network was imported any Junctions which fall on unconnected Inflow Areas are automatically connected to the adjacent Junction. If there are multiple Junctions imported on top of the same Inflow Area, only one will be connected, so it is important to review if all of the automatic connecting occurred as expected. In the case of Comm (3) and the Vault Arch Chamber SWC, it appears that the Inflow Area connected automatically to the structure downstream of the Vault Arch Chamber SWC. This can be easily updated by by right click on  on Comm (3) and  and select Reconnection  Reconnect Inflow. Then  Then place the inlet next to the parking island as  as shown.

Image RemovedImage Added

Image Removed

Since the Inflow Area was reconnected to the Vault SWC the previous inlet connection at Standard MH (5) immediately downstream of the Vault needs to be removed. Edit the Manhole and under the Inlets tab, select the Inlet name which does not have a check for Incoming Item and select the Remove [-] button as shown below. This will ensure that only Inlets connected to model elements will exist.

Image Removed

Now the Vault Image Added


Now that the Arch Chamber SWC has been configured, add a flow path as shown in order to view a Profile of the drainage system. Right-click the the Flow Paths layer layer, select select Add and  and click once on the Junction at the top-middle of the site then  then once at the downstream most Junction at  at the lower right corner of the site. Hit the Esc key to  to end the action, then then right click on the  on the Flow Path layer and select  and select Show Profile.

Image RemovedImage AddedImage Removed

Image Added

Image RemovedImage AddedImage Removed


Image Added

Automatically Correct Data

Just like in the Plan view, the Flow Path shown in the Profile view can be zoomed into by using the mouse wheel and panned by using the mouse or by the view controls in the top left of the dialog. Notice in the Profile that while the Pipe Connections which were imported from GIS were brought into the software at the correct invert elevations the Junctions between pipes are not set to the correct elevations. Close or minimize the Profile view and under the Pipe Networks ribbon Preliminary Sizing ribbon select Synchronize Manhole Invert Levels (Synchronize MH ILs). This will Automatically set the manhole inverts to the lowest connected pipe connection.

Image RemovedImage Added


View the Flow Path Profile view again to see the corrected pipe network.

Image RemovedImage Added


Size Pipe Network

Now that the Vault Arch Chamber SWC has been added and configured, Automatically Size the Size the Pipe Network within the  within the Connections form by  by double clicking on the  on the Connections Layer on  on the Tree View, or by by select Connections on the  on the Pipe Networks ribbon.

Image Removed Image RemovedImage Added Image Added


Pipe Networks can be sized based on Flow Paths - select a  a Flow Path from the  from the drop down list and  and notice that the Connections list is sorted with Connections and Branch Lines based on the Flow Path selection. Sizing will occur for all Connections contained in the Flow Path and all Branch Lines. Select Auto Size to  Select Pipe Sizing Wizard to perform preliminary sizing of the Pipe Network.

Image RemovedImage Added

Image Removed

Once the Auto Size is performed the diameters of many of the pipe Connections are upsized based on the Pipe Sizing Results, listed below the Connections Input table. Design Constraints and Sizing IDF input is controlled by the Pipe Sizing Criteria options under the Pipe Networks ribbon.

Image Removed

Select OK to apply the newly upsized Connection diameters and to close the Connections form.

Pipe Sizing Wizard is opened any previously defined Flow Path can be selected for sizing, including the entire Flow Path and all of its tributary branches. Since only one Flow Path has been created simply select Next to proceed to Pipe Sizing Criteria.

Image Added


As the Pipe Sizing Wizard uses the Rational method for peak runoff flows based on the Preliminary Sizing input within the attached Inflow Areas, Select the Greenville IDF Table as the Rainfall Source and select the 10 year return period as the event sizing for the pipe network.  These Rainfall Sources can be reviewed under the Rainfall ribbon if desired.

Image Added


A default Pipe Sizing Library has already been created and can be loaded by selecting the Open folder, then select NO when prompted about saving the current table. Select the US Default Pipe Library file, select Open. A list of typical pipe diameters and associated min/max design slopes will be shown. These may vary per manufacturer but these values will be used for the sake of the tutorial project.

Image Added

Image Added


Select OK to return to the Sizing Criteria dialog.

Image Added


In this example project a design engineer has already laid out the desired invert elevations and slopes of the stormwater pipe network. In order to only size pipe diameters select Slopes and Invert Levels under the Lock dropdown menuSelect Next on the Pipe Sizing Wizard to proceed.

Image Added


The Summary of Changes table will list the changes made to the network and by hovering over a highlighted value the previous value can be seen. As the invert elevations and slopes of the pipe network were locked only Diameter changes were made to accommodate incoming flow to the system, based on the Preliminary Sizing Inflow Area parameters and the constraints chosen in the 'Sizing Criteria' step of the wizard. Select Finish to apply updates and review a Sizing Summary Report.

Image Added


Upon selecting Finish for the Pipe Sizing Wizard, by default the Pipe Sizing Report will be shown. There are several result formats to choose from, including the standard HEC-22 Preliminary Sizing Report format. Review the design results as desired and close the dialog when completed.

Image Added

Validate System Data

For a system wide check for any potential discrepancies, under the Analysis ribbon select either Validate or Go – this will run an audit of the storm system and list any potential issues in the model.

While the Junction levels have already been corrected to match the Connection levels there is still a data inconsistency that was found due to small adjustments made during the Auto Size process. By potential data inconsistency - Standard MH (1) has a sump (where the Manhole is deeper than any connected pipe). By checking the Levels box the inconsistencies  this inconsistency can automatically be updated - select Apply to apply automatic update.

Image Removed

Image Removed. Additionally, when the Comm (3) Inflow Area was connected to a new destination the original Inlet specification is no longer applicable. Check the Connectivity box and then select Apply to automatic update these two items.

Image Added


Image Added


At this point all inconsistencies between the Junctions and the Connections have been noticed and automatically corrected. The Validate dialog shows no discrepancies are outstanding. Select OK to close the dialog.

Image RemovedImage Added


Now the stormwater system is ready for full hydraulic analysis – browse to the the Analysis ribbon  ribbon and select select Go to  to solve the model.

Image RemovedImage Added

Scroll PDF Exporter Ignore

Quick Link
imagecheckbox_checked.png
linkxpdrainage+Tutorial
titleBack to: xpdrainage Tutorials


Section Pages

Children Display
depth2
pagexpdrainage Introduction Project - USA