Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The following tutorial for xpdrainage is intended as a detailed walkthrough to the workflow and design elements used for sizing stormwater systems for a typical site development project. Pre- and Post-Developed catchment runoff is evaluated, as well as the effectiveness of the Post-Developed Stormwater Control Treatment Train. Upon completion of the tutorial, you are encouraged to further explore the wide variety of elements available for use in the software, such as the numerous types of Stormwater Controls (SWC) and Outfalls.

The table below provides the list of topics covered in this tutorial - click the topic to go to that Tutorial. Download the Advanced Tutorial Model in order to select the associated phases and follow the tutorial in xpdrainage.  

Scroll PDF Exporter Ignore

Quick Link
imagecheckbox_checked.png
linkxpdrainage+Tutorial
titleBack to: xpdrainage Tutorials


Section Pages

Children Display
depth2
pagexpdrainage Advanced Tutorial - USA