Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Each Likelihood of Failure is based on one or more factors. A project can contain a library with dozens of LOF's which are combined with customized weighting during the Risk calculation. Typical data used in LOF's include asset attribute data (e.g., install date, pipe material) and various GIS data (e.g., Soil type, etc.).

...