Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The Scheduler is initialized by selecting the Apps command from the InfoWater Pro tab. With the Apps Manager dialog box open, click Scheduler and the Scheduler - Pump Group dialog box appears.

The Main Menu is displayed at the top of all the main Scheduler dialog boxes and consists of the following sub-menus:

Image Added

View

The View pull-down menu provides access to Input Data, Simulation, Output Report, and Export dialog boxes as well as Exits the Scheduler module

Image Added

Run

This menu will Start/Stop the optimization routine.

Image Added

Help

The Help menu allows you to access the Contents or Index page of the On-line Help file.

Image Added


About Scheduler... Shows the Version of the Scheduler Module

Image Added

Input Data - The Input Data view category specifies the desired pump, valve and pipe groupings, maximum number of switches, start time, simulation duration, minimum switching interval, source cost table, system constraints, and pertinent options to run a scheduling optimization run. The input data categories are as follows:

...