Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The Scheduler is initialized by selecting the Apps command from the InfoWater Pro tab. With the Apps Manager dialog box open, select the click Scheduler and click the “Run” buttonthe Scheduler - Pump Group dialog box appears.

Input Data - the The Input Data view category specifies the desired pump, valve and pipe groupings, maximum number of switches, start time, simulation duration, minimum switching interval, source cost table, system constraints, and pertinent options to run a scheduling optimization run. The input data categories are as follows:

...