Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

System constraints include the maximum and minimum junction pressures, maximum pipe velocities, maximum pump, pipe and valve flows, maximum junction water age, as well as maximum, minimum and ending tank levels. The decision variables include pump, valve, and pipe operating controls. Multiple pumps, valves and pipes can be grouped where each component in a group will operate in an identical fashion, having similar operating schedules and switching times. A maximum of 100 groups per variable type can be selected with this version of the Scheduler. Following the completion of a successful Scheduler run, the user is you are presented with the best scheduling policy identified for the input parameters specified. The output results are the operational time-based control rules that indicate when a particular group of pumps, valves or pipes should be turned on or off over the specified period of time along with the total cost.

Finally, the Scheduler can automatically update the active Control Set with the computed control rules or the user you can define a new Control Set and populate it with the resulting operation policy.

The Scheduler is initialized by selecting the Apps command from the InfoWater Pro tab ribbon. With the Apps Manager dialog box open, click select Scheduler and click on the Run button as shown below.


Image Added

The Scheduler - Pump Group Group dialog box appears.

Main Menu

The Main Menu is displayed at the top of all the main Scheduler dialog boxes and consists of the following sub-menus:

Image Added

View

The View pull-down menu provides access to Input Data, Simulation, Output Report, and Export dialog boxes as well as Exits the Scheduler module.

Image Added

Run

This menu will Start/Stop the optimization routine.

Image Added

Help

The Help menu allows you to access the Contents or Index page of the online Help file.

Image Added


About Scheduler... Shows the Version of the Scheduler Module

Image Added

Toolbar

Image Added

View Menu

The View Menu pull-down allows you to access the Input Data, Simulation Run Manager, Output Report Data and the Export Tab of the Scheduler Interface. The portion of the dialog box shown below shows you the choices available.

Image Added

Menus: Input Data, Simulation, Output Report, and Export

Image Added Previous ViewReturns to previous Scheduler dialog box.

Image AddedNext View - Go to next Scheduler dialog box.

Image Added Start Optimization Simulation - Begins the optimization simulation.

Abort

Image Added Edit Domain - Opens the Domain Editor. The Domain Manager can be used to select a sub-set of the network which you are analyzing to be placed in a certain group.

Image AddedShow Help Contents - This button will take you directly to the Contents tab of this Help file.

Image AddedShow Help Index - This button will take you directly to the Index tab of this Help file.

Image AddedDisplay Scheduler Information - This button displays the Scheduler information.

Image Added


Input Data - The Input Data view category specifies the desired pump, valve and pipe groupings, maximum number of switches, start time, simulation duration, minimum switching interval, source cost table, system constraints, and pertinent options to run a scheduling optimization run. The input data categories are as follows:

Control Group - The user has You have the ability to define the control groups to be used in the optimization analysis. Each control group is identified as having one or more pumps, valves and pipes. In addition, the user you can modify any group previously identified, set the number of acceptable switches, start time, optimization duration, and switching interval for each group. Each pump, valve and pipe can belong to only one control group within a single data field column (e.g., Pump ID 10 cannot belong to both Pump Group 1 and Pump Group 2). You can create as many data field columns as desired to evaluate different grouping options (various operational improvement alternatives). Only pumps, valves and pipes that are candidate for optimization need to be associated with a group ID. Pumps, valves and pipes that do not belong to a particular group will remain unaffected (their operating status unchanged) by the optimization process. The Scheduler will determine a single combination of control rules (start and stop times) for all pumps, valves, and pipes within any particular group. If distinct control rules are desired for specific pumps, valves, and pipes, then these components must be placed in separate groups.

Source Cost - The Source Cost allows the user you to input the cost of supplying water either in the form of a single cost per volume of water or in the form of a curve describing the cost per total flow leaving the tanks or reservoir. The curve must be defined in the main model in order to be selected and it overrides any cost rate per volume already entered.

...

Options - The Options dialog box controls Genetic Algorithm optimization options during the optimization run. Within this dialog box, the user specifies you specify the data units, penalty cost data, weighting factors, convergence parameters, and advanced GA options.

...

Output Report - Activates the OUTPUT REPORT Output Report view category to review detailed output optimization results.

Export - Activates the EXPORT Export view category to update the Control Data Sets in the main model with the calculated scheduling policy.

...