Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Info
titleNote

The analysis will assume a 1m² plan area shaft up from the soffit of the tank up to the exceedence level. As such the Total Volume value will include this additional volume up to the freeboard level if present

Tank: Dimensions

Image Modified

The depth within the stormwater control is determined from two of the following three parameters, with the third automatically calculated based on the option selected:

...