Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

When checked, InfoWater determines the design flow (or the maximum flow available) from each junction node being simulated such that pressure within the Critical Node Searching Range does not drop below the minimum design pressure specified.

...

When checked, InfoWater determines the design flow (or the maximum flow available) from each junction node being simulated such that pressure within the Critical Node Searching Range does not drop below the percent of the maximum static pressure specified.  

...